Bathroom Remodeling Guide

Remodel Bathroom Section




Social bookmarking
You like it? Share it!
socialize it

Newsletter

Subscribe to our newsletter AND receive our exclusive Special Report on Bathroom-Remodeling
Email:
First Name:



Main Remodel Bathroom sponsors


MR.BEER® Home Brewing Kits. American's #1 Home Brewing System. Makes a great gift!

Latest Remodel Bathroom Link Added

INSERT YOUR OWN BANNER HERE

Submit your link on Remodel Bathroom!



Newest Best Sellers


Welcome to Bathroom Remodeling Guide

Click Here
Ads by AdCommunal

Remodel Bathroom Article

Thumbnail example. For a permanent link to this article, or to bookmark it for further reading, click here.

20. Replacing a Bathtub

from:

Replacing an old tub with a new fiberglass tub and shower surround is not as hard as you think. For remolding jobs, there are new two piece tub/shower replacements designed to be able to fit through the typically smaller bathroom doors.

The first job is to remove the old tub, which will be messy, so be prepared. Take a rag or duct tape and cover the drain to keep debris out. Before the destruction phase, turn off the water supply lines, both hot and cold water lines. After the water is off, remove the small end caps from the handles and with a screwdriver remove the screw and then each handle. With a pair of channel lock pliers and a soft cloth, unscrew the spout, being careful as to not scratch it. After this is removed, using the same pliers, remove the shower head and pipe.

Now, carefully start to remove the shower walls by using gloves and a small sledge hammer, knock out piece of the existing wall, right to the studs remembering to remove all the screws and nails. It is important to take care in and around the tub faucet and shower head, leaving the existing plumbing in place to be re-used later. Now for the tub removal, an old cast iron tub will break apart with a little force, or if there is a big enough window or door, remove the drain and spout and with help remove the entire tub.

With the tube removed and the shower wall area completely striped back to the studs, make any repairs needed to the flooring, plumbing or existing framing. The new tub should be in two pieces, the tub and the shower walls, all three sides, as a second piece. This will have only one seam at the top of the tub, but hidden and leak free. Position the new tub in place, propping up one end to connect the drain to the new tub then slowly position into place. Follow the manufactures instructions if you need to drill a hole for the spout. With the tub in place, bring in the shower wall section, and again follow the manufactures instructions if you need to drill a hole for the faucet and/or the shower head. The tub and shower wall unit is designed to interlock with a leak free single seam for a clean seamless look. After the wall section is installed, using new ‘greenboard’, a water resistant sheetrock designed for bathroom, patch in at the top of the shower walls as needed.

With the faucet and showerhead re-installed, turn on the water and test the new tub. That should be your new bath tub successfully installed!




 

Remodel Bathroom News

Santa Monica Beach Bathroom Remodel Worth $5 Million - LAist


LAist

Santa Monica Beach Bathroom Remodel Worth $5 Million
LAist
Santa Monica beach goers will get to enjoy fancy new public bathrooms this summer, but the lofty price tag has aggravated some city taxpayers. Seven public bathroom facilities, each containing 14 colorfully tiled stalls, will cost the city about $5 ...

and more »

Read more...


Best of 2012: Best kitchen & bath remodeling - nwitimes.com


Best of 2012: Best kitchen & bath remodeling
nwitimes.com
When you remodel a kitchen or bathroom, it's not just about the cabinets. That's why Schilling's convenient one-stop shop is favored by area residents. Starting with in-stock cabinets that are everyday-priced 20% lower than the box stores, ...

Read more...


Offer is made on Home for Generations house - Coon Rapids Herald


Coon Rapids Herald

Offer is made on Home for Generations house
Coon Rapids Herald
For example, relocating the front door had a $2000 price tag, roof gable and studs over the front door cost $3000 and remodeling the basement, minus the bathroom, cost $10000. Interior work done by Legacy Homes included opening the stairwell wall and ...

Read more...


Boulder building permits: May 21, 2012 - Daily Camera


Boulder building permits: May 21, 2012
Daily Camera
110; $17771.76; Boulder Community; Remodel of the Women's Clinic at Boulder Community Hospital. To include addition of a storage room and a new partition in the hallway. PMT2012-01601; 1880 Redwood Ave.; $48111.80; Tiphaine and Paolo Bonetti; ...

Read more...


CBJ: Property transfers and building permits for May 21 - The Daily Progress


CBJ: Property transfers and building permits for May 21
The Daily Progress
Seal, Nancy O., adding GFCI outlet in bathroom, $500, $30.60, Remodel USA Inc. » Seal, Nancy O., add Jacuzzi tub in bathroom, $500, $30.60, Remodel USA Inc. » Sherwood, Robert P. or Cindy L., installing inside gas line to generator, $500, $35.70, ...

Read more...