Bathroom Remodeling Guide

Bathroom Design Pictures Section




Social bookmarking
You like it? Share it!
socialize it

Newsletter

Subscribe to our newsletter AND receive our exclusive Special Report on Bathroom-Remodeling
Email:
First Name:



Main Bathroom Design Pictures sponsors


MR.BEER® Home Brewing Kits. American's #1 Home Brewing System. Makes a great gift!

Latest Bathroom Design Pictures Link Added

INSERT YOUR OWN BANNER HERE

Submit your link on Bathroom Design Pictures!



Newest Best Sellers


Welcome to Bathroom Remodeling Guide

Click Here
Ads by AdCommunal

Bathroom Design Pictures Article

Thumbnail example. For a permanent link to this article, or to bookmark it for further reading, click here.

20. Replacing a Bathtub

from:

Replacing an old tub with a new fiberglass tub and shower surround is not as hard as you think. For remolding jobs, there are new two piece tub/shower replacements designed to be able to fit through the typically smaller bathroom doors.

The first job is to remove the old tub, which will be messy, so be prepared. Take a rag or duct tape and cover the drain to keep debris out. Before the destruction phase, turn off the water supply lines, both hot and cold water lines. After the water is off, remove the small end caps from the handles and with a screwdriver remove the screw and then each handle. With a pair of channel lock pliers and a soft cloth, unscrew the spout, being careful as to not scratch it. After this is removed, using the same pliers, remove the shower head and pipe.

Now, carefully start to remove the shower walls by using gloves and a small sledge hammer, knock out piece of the existing wall, right to the studs remembering to remove all the screws and nails. It is important to take care in and around the tub faucet and shower head, leaving the existing plumbing in place to be re-used later. Now for the tub removal, an old cast iron tub will break apart with a little force, or if there is a big enough window or door, remove the drain and spout and with help remove the entire tub.

With the tube removed and the shower wall area completely striped back to the studs, make any repairs needed to the flooring, plumbing or existing framing. The new tub should be in two pieces, the tub and the shower walls, all three sides, as a second piece. This will have only one seam at the top of the tub, but hidden and leak free. Position the new tub in place, propping up one end to connect the drain to the new tub then slowly position into place. Follow the manufactures instructions if you need to drill a hole for the spout. With the tub in place, bring in the shower wall section, and again follow the manufactures instructions if you need to drill a hole for the faucet and/or the shower head. The tub and shower wall unit is designed to interlock with a leak free single seam for a clean seamless look. After the wall section is installed, using new ‘greenboard’, a water resistant sheetrock designed for bathroom, patch in at the top of the shower walls as needed.

With the faucet and showerhead re-installed, turn on the water and test the new tub. That should be your new bath tub successfully installed!




 

Bathroom Design Pictures News

Detailed approach results in a beautiful bathroom: 2011 Renovation Inspiration ... - Pittsburgh Post Gazette


Detailed approach results in a beautiful bathroom: 2011 Renovation Inspiration ...
Pittsburgh Post Gazette
But pretty pictures aren't much help when you hate your bathroom and the roof and gutters are leaking. So in early 2007 the couple signed up for a RenPlan consult through the Community Design Center of Pittsburgh. The result was the beautiful ...

Read more...


Builders on board with feng shui - OCRegister


Builders on board with feng shui
OCRegister
"You want the front door to be solid, not glass," she says, eyeing the position and color of the door, examining the stairs, checking out the bathroom and inspecting the picture frames. This dining room incorporates a solid principle of good feng shui ...

and more »

Read more...


Artistic ambience accents '53 ranch - Milwaukee Journal Sentinel


Artistic ambience accents '53 ranch
Milwaukee Journal Sentinel
Examples include her kitchen, which has cherry wood cabinets and wood ceiling beams, and the first floor bathroom with its black Carrera glass walls and swans etched in the shower doors. "The bathroom is Art Deco and original to the house," Chiger said ...

Read more...


How to Tell When You're Over-Propped - New York Times


New York Times

How to Tell When You're Over-Propped
New York Times
For proof of this phenomenon, one need only consult one of the shelter magazines or a design blog like Apartment Therapy that features photos of homes designed down to the last detail. Studying these spaces, one can't help noticing that the décor seems ...

Read more...


Steve Powell's legal troubles may not be over - KTVN


Steve Powell's legal troubles may not be over
KTVN
Today, Fossil, Inc. announced plans to shut down Reno-based Skagen Designs. Skagen Designs has been in Reno for 12 years making watchesMore >> Watch, clothing, handbag and wallet maker, Fossil, Inc. has announced plans to shut down Reno-based Skagen ...

and more »

Read more...